Last fall, SMART General President Joseph Sellers traveled to UBS Arena, then still in progress, to tour and meet members working on the brand-new, $1.5 billion multipurpose home of the New York Islanders, which opened on November 20, 2021. Watch the video of their trip to see how our entire union – including sheet metal, testing and balancing, sign installation and Transportation Division members – came together to construct UBS Arena, as well as track for a new rail station serving the stadium.
Unique to this project was the presence of SMART members from across our union, including Local 137 sign members who installed the giant center ice board, as well as signage around the arena and in the new train station built to handle swarms of fans from across Long Island and the NY metropolitan area.
SMART-TD members led the way in constructing the Long Island Rail Road track leading to the new station. SMART Local 28 sheet metal workers installed all parts of the HVAC system, including ductwork, rooftop units, fans, fire dampers and smoke purge systems. SMART members also installed architectural features, including roofing and decking, and specialty work such as kitchen equipment, lockers and toilet partitions.
Read more about the project:
Sheet metal and TD members have hands in UBS Arena project
Related News
- SMART-TD members ratify tentative agreement with Norfolk Southern
- TD DLC firm pitches in to assist with Minn. 2PC success
- Sara Youngdahl is new SMART-TD DLC Coordinator
- Michael Coleman is elected SMART General President, succeeding Joseph Sellers
- Members of GO-953 ratify historic tentative agreement with Union Pacific
- A Memorial Day message from TD President Jeremy Ferguson
- Nevada members: Let Gov. Lombardo know he should sign rail safety bill!
- Debt default threatens American workers: Take action today
- SMART Local 110 hosts Take Kids Fishing Day events with Union Sportsmen’s Alliance
- GO-851 and GO-513 reach tentative agreement with CSX with paid sick days