As the Federal Railroad Administration (FRA) works toward having effective safety regulations in place for the operation of positive train control prior to its 2015 congressionally mandated implementation, the agency is reaching out for feedback to its early proposals. In fact, many PTC operations likely will commence prior to 2015 mandatory date.
In response to specific questions asked by the FRA at a recent public hearing, the UTU and five other rail labor organizations jointly responded with regard to permissible use of certain locomotives, required enforcement of PTC’s ability to correct train overspeed, permissible use of non-PTC equipped or functional trains on PTC-required track, and use of unequipped trains and failed PTC trains.
- The location of PTC-equipped locomotives in the engine consist: The FRA asked how a railroad is to handle a situation where an engine that is PTC-equipped is positioned with long hood forward or has a broken air conditioning unit.
Responsible operating personnel recognize that operating a North American cab locomotive in the long hood forward position is patently unsafe and should only be permitted for short distances and then only in emergency situations, said the labor organizations.
Operating trains with the long hood forward presents safety concerns because the engineer has a limited view of the railroad with that configuration.
Related News
- ALERT for L.A.-area members — operator stabbing suspect at large
- SMART-TD wins SEPTA members’ security in their chosen craft
- Shining brightly in the midst of darkness
- Early-bird pricing for TD National Training Seminar ends April 30
- FTA action on bus, transit safety plans praised by SMART-TD
- SMART-TD, FRA announce federal regulation requiring two-person freight crews
- SMART-TD Union Demands Action in Wake of Los Angeles Bus Hijacking
- REEF Act passes in Senate committee
- SMART-TD provides focused training for bus and transit officers
- FRA issues safety bulletin on securing rolling stock